Chase Bank Garage Restoration, New Hyde Park, NY
In coordination with an engineering team, design of full slab replacement (5,000 sf) including two car ramps and repair of structural steel at top of building as needed. Project included removal of existing fireproofing, installation of Carboline Pyrolite fireproofing, and installation of new Siplast Teranap System waterproofing membrane. Project challenges included psf loading limitations at each floor and ongoing occupation by the owner’s employees.